Fire Risk Assessment & Auditing

Fire Risk Assessment & Auditing

Amet Industries Fire Protection Services can provide or assist with Fire Risk Assessment & Auditing. We also perform periodic servicing of your fire protection systems.

Our fully trained & qualified team can ensure compliancy with all appropriate standards.  These standards include:
Australian Standard AS5062-2016
Maintenance of Fire Protection Systems Equipment AS1851 – 2012
and the Building Code of Australia.
This is relevant for new or existing fire safety systems.

Our Fire Risk Management Services include:

  • Independent facilitation of risk assessments and reviews
  • Risk assessment
  • Action planning
  • Risk management planning
  • WHS System Audits
  • Systems analysis and development
  • Safe operating/work procedures
  • Safety and Health Investigations
  • Incident Investigations
  • Risk management training (G1,G2)
  • Incident Cause Analysis Method (ICAM)
  • Cost-benefit analysis in WHS
  • Programs and solutions evaluation
  • Maintenance compliance audits
Fire Risk assessment & Auditing Matrix
Source: Queensland Government

System Logbooks for Fire Protection Systems & Equipment

Even with advancements in technologies, fire authorities and fire technicians require that system logbooks are still required for the routine service of fire protection systems and equipment. See Australian Standard AS 1851 – 2012

⁜ Site logbooks are required for the following:

  • Portable Fire Equipment
  • Fire Detection System
  • Emergency Warning and Intercommunication System (EWIS)
  • Smoke and Heat Alarms
  • Fire Doors
  • Fire Tanks
  • Special Hazard Systems
  • Fire Sprinklers
  • Fire Pumps
  • Fire Hydrants
  • Exit and Emergency Lighting (not included in AS1851 but in AS2293 standards)